willbö
Home · Insights

Insights · Updated monthly

What we're thinking about between projects.

Technical and commercial notes from the willbö engineering room. Honest writing on what's actually viable, what broke, and what we'd do differently on the next hull or the next plant. No white papers, no thought-leadership fluff — just working notes we'd want to read ourselves.

Filter
CAPCO2 Approval in Principle with Bureau Veritas
CAPCO2 · Bureau Veritas AiP · April 2026
Featured · Products · CAPCO2
12 min read · Apr 2026 · Enrique Araujo Fernández

Onboard CO₂ capture in commercial shipping: what's actually viable in 2026.

A technical and commercial read on MEA absorption, skid integration, and the EU ETS / FuelEU cash-flow logic for intra-EU ferries. Where the numbers work today, where they don't, and the three retrofit configurations we keep seeing on feasibility desks.

Read the note →

More reading

TECHCO2 launch consortium at ASIME Vigo, 15 May 2026
TECHCO2 · ASIME Vigo · May 2026
Press · Project milestone

TECHCO2 launched at ASIME, aligned with IMO MEPC 84.

The willbö + Silecmar + Neuwalme consortium presented the launch at ASIME Vigo on 15 May 2026, with the Vigo Port Authority among attendees. The MRV layer behind CAPCO2 arrives aligned with the regulatory framework approved at IMO MEPC 84.

10 min · May 2026 · Julián Fontela
Carnival Mardi Gras — BOLT waterpark
Carnival Mardi Gras
Marine · Structural

From STAAD to Tekla: how transport-aware modular design cut 30% steel on a cruise-ship waterpark.

A walkthrough of the BOLT waterpark structural package — modular geometry, Tekla Structures fabrication drawings, and lift-on logistics at Meyer Turku.

9 min · Mar 2026
holö platform
holö
Products · holö

Why HoloLens 2 beats 2D drawings for shipyard project review.

The workflow we've validated with EPCs and owners, what breaks, and why the tree-view of linked docs matters more than the goggles.

7 min · Mar 2026
SH Vega
SH Vega · polar cruise
Marine · Polar

Designing for PC5: what changed on SH Vega that wouldn't ship in a temperate class.

Steel-grade selection, hull-form iteration and winterisation on a 113 m polar-class cruiser at Helsinki Shipyard. The non-obvious stuff owners ask about.

10 min · Feb 2026
Juan Pablo II
Juan Pablo II
Marine · Fishing

20 refrigerated brine tanks: engineering a tuna seiner end-to-end under Bureau Veritas.

A complete concept-to-production package on a 76.6 m Bureau Veritas-classed tuna seiner at Murueta. Hull, outfitting, machinery — and the coordination layer Vigo–Mumbai.

11 min · Jan 2026
Industrial · Refining

Talara refinery: what willbö's first industrial contract taught us about scope discipline.

The 2018 project that kicked off the company. What we under-scoped, what we over-engineered, and the checklist that made every subsequent EPC easier.

6 min · Jan 2026
Industrial · Power

Combined-cycle engineering: the margin compression nobody will talk about.

Where the 2015–2026 curve actually sits, which disciplines are losing money, and the outsourcing split that makes a mid-size CC engineering pack still viable.

8 min · Dec 2025
CAPCO2 calculator
CAPCO2 · Calculator
Products · CAPCO2

Inside the CAPCO2 calculator: the five numbers your ops team actually needs.

CII rating delta, FuelEU exposure, retrofit CAPEX, OPEX uplift, payback window. The model behind our public tool, annotated.

8 min · Dec 2025
Vigo Mumbai bridge
Process · Two-office engineering
Process & team

The 24-hour engineering cycle: running Vigo ↔ Mumbai without losing the weekend.

How we schedule hand-offs, what gets tracked, and the time-zone practices that turn a classic offshore-delivery anti-pattern into a real pace advantage.

9 min · Nov 2025
Process & team · Hiring

What we look for in a junior naval architect in 2026.

The three things we'll train you on and the two we won't. Why class-society intuition matters more than Rhino speed.

5 min · Nov 2025
The willbö note · Monthly

One email, once a month. One article per division.

Marine, industrial, and a product update from CAPCO2 or holö. Written by the engineers on the projects. Zero marketing.

Press · speaking · collaborations

Writing something that needs our input?

Journalists, conference organisers, and technical partners — direct line below.

willbo@willbo.es →
Follow
willbö on LinkedIn
New notes go out on LinkedIn first. We post when something ships, not on a content calendar.