Sizing
Electrolyser matched to the off-taker's hourly and weekly consumption curve, not to an idealised load factor.
Captive hydrogen for industrial process
Basic engineering for a 2 MW captive green-H₂ installation — designed to feed a specific industrial process as a direct decarbonisation lever, sized to match hourly off-take rather than commodity export.
Alcance previsto de willbö
El alcance definitivo se cerrará con el cliente en la fase de basic engineering. Estos son los bloques de trabajo ya identificados.
Electrolyser matched to the off-taker's hourly and weekly consumption curve, not to an idealised load factor.
Tie-in with the existing process: pressure levels, purity class, fail-safe logic on the end-user side.
ATEX zoning, ventilation, gas detection and emergency venting for the H₂ skid and interconnection.
Dossier for the competent authority, alignment with RFNBO criteria, documentation for subsidy schemes.
Contenido técnico
The economics and engineering of a captive 2 MW unit differ materially from a merchant plant. A public write-up will follow as the plant moves into detail engineering.
Visuals
Renders, P&IDs y fotografías del proyecto se publicarán aquí tras la aprobación del cliente.
Trabaja con nosotros
Concept, basic, detail y supervisión — para proyectos de captura de CO₂, hidrógeno, e-fuels, biogás y agua industrial. Vigo y Mumbai.
willbo@willbo.es →Memoria, P&IDs, balances y business case disponibles bajo acuerdo de confidencialidad con clientes potenciales.
julian.fontela@willbo.es →